Four sections, 25 questions each, 18 right to pass. Our practice works the way the job works: you make the call on a service scenario, then you learn why. 96 work-order calls. 100 practice-exam questions.
Core is required for any certification. Pass Core plus at least one Type and you are certified. Pass all four and you hold Universal. Fail a section and you retake only that section. An updated 608 test bank was released in August 2026; this prep teaches to the 2026 bank.
Ozone depletion, the Clean Air Act, recovery rules, cylinders, safety, and shipping.
Small appliances — factory-charged, hermetically sealed, 5 lbs of refrigerant or less.
High- and very-high-pressure systems over 5 lbs — leak repair rules, recovery levels, evacuation.
Low-pressure appliances — centrifugal chillers running below atmospheric pressure.
One sample from each section. The full practice has 96 of these, plus the 100-question exam.
Rooftop package unit, 2:40 pm. You're tracing a system with gauges on both sides and a new helper asks where the low side ends and the high side begins.
The call: The compressor and the metering device are the dividing points between the low side and the high side.
Everything between the compressor discharge and the metering device is high side; everything between the metering device and the compressor suction is low side. Get this wrong and every pressure reading you take means the opposite of what you think.
Apartment, 1.5-ton mini-split. The Type I tech is asked to service it.
The call: Not your certification — split-systems may not be serviced by Type I technicians, no matter how small.
A small appliance is manufactured, fully charged, and hermetically sealed in a factory with five pounds or less of refrigerant. A split system is none of that. That job needs a Type II or Universal tech.
A system cools both a factory floor and the offices above it. The owner asks which leak rate category applies.
The call: The category with the highest percentage of use.
If the process side dominates, it's Industrial Process Refrigeration at 30%. If comfort cooling dominates, it's 10%. The percentage decides, not the building type.
Low-pressure chiller shut down for the season. The tech leaves the system under vacuum.
The call: Bring it slightly above atmospheric pressure — an idled low-pressure system left under vacuum pulls air and moisture in.
A low-pressure system operates below atmospheric pressure, so air and moisture enter through any leak path. Maintaining pressure slightly above atmospheric keeps air out.
The calls are binary decisions on a service scenario — you pick the right move and get told why. The practice exam is 100 multiple-choice questions, 25 per section, A through D, scored 18 of 25 per section, with an explanation after every answer.
Core plus at least one Type gets you certified. Type I covers small appliances. Type II covers high- and very-high-pressure systems over 5 lbs. Type III covers low-pressure chillers. Universal means all four sections.
No. These are original practice questions. The real exam is closed-book and proctored separately.
A pressure-temperature chart and a basic 4-function calculator. Phones must be off and put away.
Five calls free, no email. The $39 pass opens all 96 calls and the full 100-question practice exam.
Start free — 5 calls See the practice test
First 5 work-order calls free, no email. $39 pass unlocks all 96 calls and the 100-question practice exam. Live until you pass, up to one year. Checkout opens at launch — preview unlock is on for review.